A mine pump station

Service water · A deep-level gold mine, Gauteng

A digital twin of a deep-level service-water system

We built a computer model of the whole service-water system, proved it matched reality, and used it to test changes before anyone touched a valve.

99%

average accuracy of the model against the real system

How to read this figure

Model accuracy, checked against measured site data and signed off by the client's engineers.

2024 to 2025 · Delivered together with a consulting partner.

The problem

What was going wrong.

Pumping water in and out of a deep mine is a major power cost, and the system across two shafts was too complex to optimise by trial and error on the real thing.

What we did

  • Audited the underground flow meters and gathered SCADA and reporting data.
  • Built a simulation of pumps, dams and pipework across both shafts.
  • Calibrated it against measured flows, pump power and dam levels until the mine's engineers signed it off.
  • Ran six optimisation scenarios, including recirculation, dam feed splits and control automation.

The result

What the client got.

The mine can now test a change to its water system on the model first.

What we found

  • The model matched the real system with 99% average accuracy, signed off by the mine's engineers.
  • Each scenario could be compared on power and water before any site change.

More work

Other case studies.

All case studies
A mine on the skyline at dawn

Let's find what your mine is losing.

Tell us about the site. We will come and look, and tell you plainly what we think it is worth fixing.